Skip to content
Log in
Register
751 - Merddin Emrys outside the Erecting Shop.
Item
of 1
Actions
Share
Merddin Emrys outside the Erecting Shop.
This item is active and ready to use
Merddin Emrys outside the Erecting Shop.
Merddin Emrys outside the Erecting Shop.
Geolocation data
(52°55′9″N, 4°6′24″W)
Search location
Item details
iBase ID
751
Title
Merddin Emrys outside the Erecting Shop.
Description
Keywords
Notes
File metadata
Merddin Emrys outside the Erecting Shop. Newly completed after major rebuild, June 1961. Virtually the entire superstructure is new material with the old brasswork (handrails, name/number plates) reinstalled. The frame side plates and aprons were original, but the main boiler cradle was new and weld fabricated instead of being built up out of riveted plate. The smokeboxes and chimneys were also new, but the old company Vulcan Foundry waggon-top boiler and power bogies were retained. The bogies are LT's original units fitted with JS's wheelsets. It appears that the vertical stanchions for the handrails and the cast stands for the sand pots (not yet fitted) were reused. The dome covers came from a South Eastern and Chatham Railway P class 0-6-0T locomotive, whilst the cabside stanchions on the fireman's side are ex-England locomotive originals.
Source. Derek Harrison
///roadways.venturing.stress
SH5844937859
Merddin Emrys outside the Erecting Shop. Boston Lodge. Double Fairlie.
This item includes these files
Image
Links
Collections with this item
Other items like this
Clear all
Search within
By field
By location
By folder / collection
By your searches
Export
Collection
TOOLBAR:Lightbox
Edit
Workflow