Archer's Dam (Culvert 2) during the Deviation.

Archer's Dam (Culvert 2) during the Deviation.
Archer's Dam (Culvert 2) during the Deviation.
Archer's Dam (Culvert 2) during the Deviation.
Geolocation data
(52°58′15″N, 3°58′20″W)
Item details
iBase ID
1074
Title
Archer's Dam (Culvert 2) during the Deviation.
Date
07/05/1974
Archer's Dam (Culvert 2) during the Deviation, 7 May 1974. Temporary tramway to remove spoil from New Tunnel North cutting, which was being blasted and dug out at the time. The spoil is being tipped to create the new formation alongside Llyn Ystradau in the distance. The actual tunnel work would not commence until the following year. The structure beyond the weir instrumentation is a corrugated steel storage shed for tools.

Source. Tony Brown

///bordering.stud.shuttered
SH6763843349
This item includes these files